Beijing’s New Airport Project

The Beijing’s new airport is also called as the second capital airport which has not been formal named right now. It is a super large airport which is located in the area between Beijing city and Langfang City of Hebei Province. It is designed by French ADP Ingenierie Architect and Zaha Hadid Architects and was started building in December, 2014. The whole airport is invested for more than 10 billion dollars and plan to build 1.4 million square meters’ terminal buildings with 7 airfield runways in the future.

In 2016, most main work of the airport had been started and all the work will be finished in 2019. The airport adopts advanced isolation and damping technology. Our company provide the whole damping solution and products for the airport.

Service Condition of VFD: Viscous Fluid Damper

Working Load: 1250KN

Working Quantity: 144 sets

Damping Coefficient: 0.1

Operation Stroke: ±800mm